1st choice restoration
Member
What's been ur largest loss that you've worked.... ???Strictly dry outs not build backs....
Every year we seem to hit one home run. Last year we had a 100k mold job. Personally the two 50's were less pressure and easier to manage than the big one. As are the 2-5k water losses
how many guys do you have working these jobs?A medical building, all mitigation, no put back, 95K.
HOWEVER I just billed the three we did last week and well...
$989.00
$677.00
$417.00
Hopefully the ones we did Saturday are bigger.
12-15 guys and we could have used 5-times that. It was a killer week of drying followed by three supervisors going through with thermal cameras for a day verifying all ways dry but some stairwell areas that needed to be removed.how many guys do you have working these jobs?